首同层排水系统及污水管标高问题

室内排水管道安装工程 室内排水管道安装工程 室内排水管道安装工程 室内排水管道安..
扫扫二维码,随身浏览文档
手机或平板扫扫即可继续访问
室内排水管道安装工程
举报该文档含有违规或不良信息。
反馈该文档无法正常浏览。
举报该文档为重复文档。
推荐理由:
将文档分享至:
分享完整地址
文档地址:
粘贴到BBS或博客
flash地址:
支持嵌入FLASH地址的网站使用
html代码:
&embed src='/DocinViewer-4.swf' width='100%' height='600' type=application/x-shockwave-flash ALLOWFULLSCREEN='true' ALLOWSCRIPTACCESS='always'&&/embed&
450px*300px480px*400px650px*490px
支持嵌入HTML代码的网站使用
您的内容已经提交成功
您所提交的内容需要审核后才能发布,请您等待!
3秒自动关闭窗口08-1 室内铸铁排水管道安装质量管理_百度文库
两大类热门资源免费畅读
续费一年阅读会员,立省24元!
评价文档:
10页免费10页2下载券10页1下载券10页1下载券10页免费 10页1下载券17页免费9页免费6页1下载券10页1下载券
喜欢此文档的还喜欢87页1下载券20页1下载券7页1下载券1页免费4页免费
08-1 室内铸铁排水管道安装质量管理|0- ​室​内​铸​铁​排​水​管​道​安​装​质​量​管​理
把文档贴到Blog、BBS或个人站等:
普通尺寸(450*500pix)
较大尺寸(630*500pix)
你可能喜欢您所在位置: &
&nbsp&&nbsp&nbsp&&nbsp
城市污水处理厂排水体系设计规划及设计说明书.doc48页
本文档一共被下载:
次 ,您可免费全文在线阅读后下载本文档
文档加载中...广告还剩秒
需要金币:150 &&
摘要Abstract
The main work is the drainage system of the old city design and planning, and design and construction of a municipal sewage treatment plants, according to the status of existing drainage works in the city, the urban future development needs of the entire city drainage works full streaming of the drainage system, iesewage rainwater built pipe network, sewage collected into the sewage treatment plant to secondary treatment of sewage discharged directly into the rivers of the edge of the town. The rainwater collected directly discharged into water bodies. Set four sewage trunk pipes to collect the neighborhood sewage, along with the river parallel to the direction to set up an Explorer interception of the trunk to collect sewage into the city sewage treatment plant. The set of four stormwater trunk pipeline to collect rainwater, and the trunk to collect rainwater directly into rivers.Set up the southeast corner of the city an urban sewage treatment plants, sewers collect wastewater for secondary treatment, wastewater treatment plant Aubert oxidation ditch treatment process, the main structures set up the grill, pumping stations, advection grit chamber, anaerobicpool, oxidation ditch, sites streaming the secondary settling tank, ultraviolet disinfection channels, sludge thickener, sludge dewatering workshop and so on. The entire sewage treatment plant layout and elevation layout, in order to ensure the rational layout of the sewage treatment plant.
Ke Se O Sludge Thickening
方案论证 1
设计任务 1
设计参数 1
设计任务及要求 3
城市排水工程规划 3
水处理厂工艺设计 3
设计成果 3
设计目的 3
设计方案的比较论证 3
排水系统的布置 3
排水工程规划 6
污水管道水力计算 6
污水管道水力计算的设计数据 6
街坊编号并计算其面积 7
划分设计管
正在加载中,请稍后...

我要回帖

更多关于 层底标高 的文章

 

随机推荐