选择题:16in octoberr,1992...

American Association of Electrodiagnostic Medicine, 39th annual meeting. Charleston, South... - Abstract - Europe PMC
Europe PMC requires Javascript to function effectively.
Either your web browser doesn't support Javascript or it is currently turned off. In the latter case, please turn on Javascript support in your web browser and reload this page.
Search worldwide, life-sciences literature
(PMID:7691558)
[):57P-82P]
Congresses, Overall
)- subscription required
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
Show all items
CitePeer Related ArticlesCiNii 図書 - Metropolis : Tokyo Design Visions : 16 October 1991 - 2 February 1992Technical Report: Coal Reburning for Cyclone Boiler NO{sub x} Control Demonstration. Quarterly report No. 11, October--December 1992
Coal Reburning for Cyclone Boiler NO{sub x} Control Demonstration. Quarterly report No. 11, October--December 1992
The project involves retrofitting/testing the reburning technology at Wisconsin Power & Light`s 100 MWe Nelson Dewey unit No. 2 in Cassville, Wisconsin to determine the commercial applicability of this technology to reduce NO{sub x} emission levels. The final set of performance tests on Lamar coal were carried out from September 27 through October 9, 1992. Hazardous air pollutant (HAP) testing was performed on Lamar coal from November 2 through November 9, 1992. Also, parametric optimization testing on western sub-bituminous coal was performed from November 16 through December 11, 1992. Both the HAP and western fuel testing were additions to the original project testing scope of Phase III. As of the end of this quarterly report period, project Phase III testing is complete. Preliminary results with western sub-bituminous coal indicate NO{sub 4} reductions in excess of 50% down to the 50% load range. In general, similar reductions are experienced but at a less aggressive stoichiometry in the reburn zone. Accordingly, an additional few percent of NO{sub 4} reduction at the same stoichiometry are noted with the western fuel compared to Lamar results.
Publication Date:
OSTI Identifier:
Report Number(s):DOE/PC/89659--T12 ON: DE
DOE Contract Number:FC22-90PC89659
Resource Type:Technical Report
Resource Relation:Other Information: PBD: [1992]
Research Org:Babcock and Wilcox Co., Cassville, WI (United States)
Sponsoring Org:USDOE, Washington, DC (United States)
Country of Publication:United States
Language:English
20 FOSSIL-FUELED POWER PLANTS; FOSSIL-FUEL POWER PLANTS; AIR POLLUTION CONTROL; STAGED COMBUSTION; NITROGEN OXIDES; PROGRESS REPORT; DEMONSTRATION PROGRAMS 200202; NOXIOUS GAS AND PARTICULATE EMISSIONS
Select the DOI to obtain a copy of this technical report from the publisher.
Save to My Library
Email address:

我要回帖

更多关于 in october 的文章

 

随机推荐