求英语太鼓达人英语帮忙翻译一封信

您当前的位置:&&&&&正文
求翻译!本人要写一篇毕业论文,以下是摘要部分,求英语达人帮忙翻译!
Sincethe90\s,theChineseapparelindustrydependencedomesticgiantmarketpotentialaswellastheinexpensivehumanresources,haveattractedmanyoverseaslarge-scaletransnationalclothingenterprisetoentrusttheprocessingtheway,enterstheChinesemarketgradually.Undersuchsituation,ourcountryapparelindustrydependedupontheOEMstrategyoncetoobtainthefastdevelopment.Ningbotookthehomebiggestclothingproductionbase,theNingboapparelindustrydevelopmentisswiftandviolent.However,undertheOEMcooperationpattern,NingboMajorityofClothingEnterprisedoesnothavethecoretechnologiesandtheindependentbrandnearly,oftenisundMoreovertheseclothingenterprisetooktheOEMproduceroftenoccupiestheapparelindustrywholeworldvaluechainbottomend,theprofitismeager.Mustsolvetheseproblems,excepttheadvancementproductiveforcescrossregionshift,thepositiveimplementation“walks”andsoonthemeasuresbyfurthertostrengthenoutsidetheNingboapparelindustryOEMproductionpatterncompetitivepower,inthelong-rangeview,mostbasicismustenhanceOurcountryOEMEnterpriseindependentinnovationability,makestheindependentbrandpositively.ThisarticlefirstfromOEMproductionpatternconceptobtaining,thenhadpointedoutOEMproductionpatternexistencesomequestions,introducedtheoverseasOEMproductionpatterndevelopmentsurvey.Then,thisarticlenarratedtheNingboapparelindustryhistoricaldevelopmentcourseandinthedomesticimportantstatus,introducedtheNingboapparelindustryOEMproductionpatterndevelopmentconditionandhasanalyzedthedifficultpositionwhichtheNingboclothingOEMproductionpatternfaces.Finally,thisarticleproposedsomecountermeasuresregardingtheNingboapparelindustryOEMproductionpatterndevelopment.Keyword:AOEM;DCountermeasure--博才网
下页更精彩:
点击排行榜
微信查看最新信息微信扫一扫或用微信搜索微信号:hbrc-com
安卓手机客户端更省流量手机扫描下载或者直接
猜你还喜欢的文章
热点文章排行榜
• 版权所有 Copyright 2011 All rights reserved.北外网院项目导航
英语特色:
企培特色:
测试调研:
学历平台登录
咨询热线:
年度评优展示
英语学习天地
非英语专业如何提高英语语音 主讲名师:李晨
中西方家庭观念上的差异你了解吗?主讲名师:吴立高
招生专业答疑
网络教育快讯
职业发展动态
北京校本部学习中心:010-10170 | 上海学习中心:021- | 南京学习中心:025-呼和浩特学习中心 | 青岛学习中心: | 广州学习中心:020-杭州学习中心:1 | 沈阳学习中心:024- | 齐齐哈尔学习中心:日照学习中心: | 宁波学习中心:1 | 泰州学习中心:
&招生咨询邮箱: && 助学建议邮箱: &&&
|||||||||||||
北外在线(北京)教育科技有限公司经营许可证编号:京ICP备号-5 | 京公网安备28Copyright 2001-, All Rights Reserved
| 版权所有: 北京外国语大学网络教育学院(北京外国语大学)求英语达人帮忙翻译一段说明书~~~是关于臭氧机的.4 Installing the System4.1.1 Receiving the systemWear steel toe shoes, safety goggles, and hard hats when moving the system.1) Remove the system from the shipping crate.2) Remove any packing materials.3) Place the system into location.FRAGILE COMPONENTS!DO NOT DROP or rattle or shake the system.4.1.2 Report andy shipment damage1) Make note of any shipment damage. Notify and then file a damage claim with the transportation carrier immediately.2) Contact WON Hi Tech Corp. immediately.4.1.3 Storing your systemIf the system must be stored be sure to store it: In the original shipping containers. In an area with a nominal ambient temperature of approximately 21°C (70°F).4.2 Facilities RequirementsDI WaterConnections: 3/4” Flaretek. Use PFA tubing.Max. Inlet Pressure: 73 psig at 40º CTypical Inlet Pressure: 30 psigTypical flow Rate: 1 to 30 slpmOxygen/ozone mixture Connections: ¼” Compression. Use 316SS Tube or PFA tubingMax. Gas Inlet Pressure: 50 psig at 40º CTypical Gas Inlet Pressure: 22 psigTypical Gas flow Rate: 5 slpmTypical Ozone Concentration: 200 – 240 g/Nm3NitrogenConnections: ¼” Compression. Use 316SS Tube or PFA tubingTypical Flow Rate: 0.5 to 3 slpmMax. Inlet Pressure: 70 psiTypical Inlet Pressure: 60 psi4.3 Electrical ConnectionsThere are two signal connections to be made.1) The interface between the dFFOZ sensor and the ODS rack via a 15 pin connector.2) The interface between the digital flowmeter and the ODS rack via a 25 pin connector.4.4 Gas and Water Connections1) Make appropriate gas and water connections, as required.2) Perform appropriate gas and water leak-checks on the system prior to operation.3) Verify that ozone leak detection equipment is installed to provide protection to all users and facility personnel.Ozone has a readily identifiable odor recognizable in extremely minute quantities.Concentrations above 0.1 ppm can cause headaches, eye irritation, respiratory problems,dizziness, and nausea. At much higher concentrations it can cause deathDo not use the system without an ozone leak monitor. Failure to do so may lead to personnel injury.5 System Startup/Shutdown/Operation5.1 Operation WarningsRead this manual carefully before applying power, nitrogen, ozone, or water to the system.Refer to the Operation Manual of the Ozone Generator for detailed setup and start-up information.Allow the system to warm-up for a minimum of 30 minutes before operating the system.During setup and verification do not apply power to the system. Make sure a ozone destructor is connected to the ozone exhaust port.5.2 System Startup1. Close ALL isolation valves and check that facilities are within specs. (Close manual isolation valves V2, 3, V4, V9 and V10, as well as needle valve V6.2. Make sure that the ozone outlet is connected to a Ozone Destructor unit.
万万wan228
4 Installing the System4. 系统安装4.1.1 Receiving the systemWear steel toe shoes, safety goggles, and hard hats when moving the system.1) Remove the system from the shipping crate.2) Remove any packing materials.3) Place the system into location.FRAGILE COMPONENTS!DO NOT DROP or rattle or shake the system.4.1.1 系统的接收移动系统时要穿上钢头鞋、防护眼镜及硬质头盔.1)将系统从货箱中取出.2)剥除所有的包装材料.3)将系统放到指定位置. 易碎部件!必须轻放,不可摔跌、颠簸或摇动.4.1.2 Report any shipment damage4.1.2
报告任何海运造成的损坏.1) Make note of any shipment damage. Notify and then file a damage claim with the transportation carrier immediately.2) Contact WON Hi Tech Corp. immediately.1)记录下任何海运导致的损坏;立刻通知船务公司并提出损坏索赔.2)即刻联系WON高科技公司.
4.1.3 Storing your system4.1.3 贮存您的系统If the system must be stored be sure to store it: In the original shipping containers. In an area with a nominal ambient temperature of approximately 21°C (70°F).如果必须将系统贮存,应该把系统存放在原来的货运箱里;贮存地点的周围温度约21°C (70°F).4.2 Facilities Requirements4.2 设施装置要求DI WaterConnections: 3/4” Flaretek. Use PFA tubing.Max. Inlet Pressure: 73 psig at 40º CTypical Inlet Pressure: 30 psigTypical flow Rate: 1 to 30 slpmOxygen/ozone mixture Connections: ¼” Compression. Use 316SS Tube or PFA tubingMax. Gas Inlet Pressure: 50 psig at 40º CTypical Gas Inlet Pressure: 22 psigTypical Gas flow Rate: 5 slpmTypical Ozone Concentration: 200 – 240 g/Nm3NitrogenConnections: ¼” Compression. Use 316SS Tube or PFA tubingTypical Flow Rate: 0.5 to 3 slpmMax. Inlet Pressure: 70 psiTypical Inlet Pressure: 60 psi直接进水接口:采用Flaretek 3/4” 接头;使用聚四氟乙烯水管最高进水压力: 40º C 时73 psig [ 磅/每平方英寸(表压)]一般进水压力:30 psig一般流速:1至30 slpm [ 集中参数简化模型]氧气/臭氧连接:1/4” 压缩.采用316SS管或聚四氟乙烯管.最高进气压力:40º C 时50 psig [ 磅/每平方英寸(表压)]一般进气压力:22 psig一般气流速:5 slpm [集中参数简化模型]一般臭氧浓度:200 至 240 g/Nm3 [克/立方毫微米]氮气连接:1/4” 压缩.采用316SS管或聚四氟乙烯管.一般气流速:0.5至3 slpm 最高进气压力:70 psi [ 磅/每平方英寸]一般进气压力:60 psi4.3 Electrical Connections4.3 电气连接There are two signal connections to be made.1) The interface between the dFFOZ sensor and the ODS rack via a 15 pin connector.2) The interface between the digital flowmeter and the ODS rack via a 25 pin connector.有两个信号连接1)通过一个15针连接器将dFFOZ 传感器和ODS架之间的界面连接.2)通过一个25针连接器将数字流量计和ODS架之间的界面连接.4.4 Gas and Water Connections4.4 气和水连接1) Make appropriate gas and water connections, as required.2) Perform appropriate gas and water leak-checks on the system prior to operation.3) Verify that ozone leak detection equipment is installed to provide protection to all users and facility personnel.Ozone has a readily identifiable odor recognizable in extremely minute quantities.Concentrations above 0.1 ppm can cause headaches, eye irritation, respiratory problems,dizziness, and nausea. At much higher concentrations it can cause deathDo not use the system without an ozone leak monitor. Failure to do so may lead to personnel injury.1) 根据需要进行合适的气和水连接.2)运行前,对系统进行适当的水、汽泄漏检查.3)核实已安装臭氧检漏设备,为使用者和设施操作人员提供安全保护.微量的臭氧也能发出一种易于识别的气味.超过0.1 ppm的浓度就可引起头疼、眼睛不适、 呼吸困难、头晕和恶心.更高的浓度将会致命.没有安装臭氧泄漏监测器不可使用本系统.不遵守规定可导致人身伤害.5 System Startup/Shutdown/Operation5. 系统的启动/关闭/操作5.1 Operation WarningsRead this manual carefully before applying power, nitrogen, ozone, or water to the system.Refer to the Operation Manual of the Ozone Generator for detailed setup and start-up information.Allow the system to warm-up for a minimum of 30 minutes before operating the system.During setup and verification do not apply power to the system. Make sure a ozone destructor is connected to the ozone exhaust port.5.1 操作警告在启动电源、使用氮气、臭氧或水之前,必须详细阅读本手册.参考臭氧发生器的操作手册以获取安装与启动的详细信息.开始操作系统前,先让系统预热至少30分钟.当安装和检验系统时,不可打开电源.确保臭氧排气口处连接一个臭氧破坏器.5.2 System Startup1. Close ALL isolation valves and check that facilities are within specs. (Close manual isolation valves V2, 3, V4, V9 and V10, as well as needle valve V6.2. Make sure that the ozone outlet is connected to a Ozone Destructor unit.5.2 系统的启动1. 关闭所有的隔离阀门,并检查确保所有设施符合规定(关闭手动隔离阀V2, 3, V4, V9 和 V10;还有针型阀 V6).2. 确保臭氧输出口与臭氧破坏器连接. 【英语牛人团】
为您推荐:
其他类似问题
安装系统剂接收系统耐磨钢趾鞋,安全护目镜,和硬帽子在移动系统。1)消除系统从运输箱。2)删除任何包装材料。3)将系统位置。脆弱的部分!不降或拨浪鼓或摇系统。名词安迪报告货物损害1)注意任何货物损害。通知和提交索赔的运输承运人立即。2)获得高科技公司立即联系。4.1.3存储系统如果...
如果要求很高的话,还是去找人工翻译吧,123翻译网是不错的人工翻译
扫描下载二维码

我要回帖

 

随机推荐